orcutt winslow

virtual project access

project

TG Barr Elementary School

TG Barr Elementary School

Phoenix, AZ

At Percy L. Julian and T.G. Barr Elementary Schools, we were given the unique opportunity to reinvent two existing and aging campuses.  Both facilities were schools serving approximately 430 students that are now consolidated into schools serving approximately 800 students.  The District is repurposing two other schools that currently house 350 students each and moving those students to Julian and Barr. When the work is complete, Roosevelt will have reduced considerable inefficiencies in the District.

 

In order for this to work, new buildings were built on the existing fields at each campus while school was still in session in the existing buildings.  When the new structures were completed, the old buildings (except the existing multi-purpose buildings) were demolished and new fields built in their place.  As with all projects of this type, success depended on open and constant communication between all the involved parties.  Students were kept safe while construction was underway, staff members were kept aware of miscellaneous utility shut downs, and the contractor kept any interruptions to the educational process to a minimum.

TG Barr Elementary SchoolTG Barr Elementary SchoolTG Barr Elementary SchoolTG Barr Elementary School

Latest News

Orcutt Winslow 2012 Sustainability Report

Since our inception in 1971, Orcutt | Winslow has been conscientious of the environment and sustainability. Our mission statement emphasizes "eco" as a commitment to action in improving building performance and the human experience. This focus is embodied from the personal actions of our employees, …read more »

Pendergast Elementary School Becomes LEED Gold Certified

The USGBC has given its final certification on Orcutt | Winslow's Pendergast Elementary School project. The points have been tallied and it's official: Pendergast Elementary has been certified LEED Gold! The project needed 44 points to qualify for the LEED Gold standards and scored 47 out …read more »

Veritas Preparatory Academy wins NAIOP Redevelopment Project of the Year

What once was a 142,000 SF corporate headquarters for Motorola now is a thriving charter school campus in the Arcadia neighborhood, thanks to adaptive reuse.  The 13.5-acre Veritas Preparatory Academy campus includes an elementary school, junior high/high school, regulation size high school …read more »

Chandler Regional Medical Center raises a beam toward expansion

By Daniel Quigley, Tribune On the southeast side of Chandler Regional Medical Center, a helicopter used to sit parked on land that is currently all dug up. That’s one memory Dr. Brian Tiffany, chief of the hospital’s medical staff, recalled when he started at the facility in …read more »

Orcutt Winslow Participating in 2030 Challenge

Buildings are the major source of global demand for energy and materials that produce by-product greenhouse gases (GHG). Slowing the growth rate of GHG emissions and then reversing it is the key to addressing climate change and keeping global average temperature below 2°C above pre-industrial …read more »

Rebuilt for the 21st Century: New school builds on memory of old campus to connect to surrounding community

Metal Architecture Magazine Marcy Marro, Managing Editor, Posted 04/01/2013   Originally built in 1953, Papago School in Phoenix is deeply rooted in the surrounding community, where generations of neighboring families attended the school. When the building became structurally obsolete, …read more »

Virtual Project Brochure

Virtual Project as a Tool Virtual Project was created to advance AEC office and project management through a comprehensive online experience. This integrated project delivery hub has the capacity to offer increased efficiency, seamless transfer of information and ease of access, all within one …read more »

close